🦋 Weekend Update
A very productive weekend... The window seat frame is installed; the seat would be on except I found out home depot does not carry the plywood I am looking for. There is a lumber yard in Union which I will try next Saturday. Mike R. came over Friday to help me with the baseboard and the electrical outlet, which I wanted to move to the front of the seat; but the baseboard proved impossible to remove from the wall. So I left it in place and put the frame in front of it. The molding has changed a lot; rather than a crown molding I have decided to use a window apron molding, which is more natural in the context and will fit in nicely with the window aprons behind the seat. I will be building it out of 6 pieces of wood and it may not be ready immediately. We had a really nice jam session this afternoon, playing about 8 songs which is about double what we normally get to, and they were a lot of fun. With Jim, I came up with a new arrangement of House of the Rising Sun which really sounds like a distinctively new sound for that song, riffing on Dylan's version but quite different. Sylvia came (of her own accord) and stayed for about two hours of jamming -- quite breathtaking to me since we were not changing our jam much at all to accomodate her in it. (Before it started, Greg saw a hawk eating a squirrel in the lower branches of a tree on the property 3 doors down from Bob's place, so we went down there to watch it for 15 minutes.) Afterwards we had a cookout, for which Sylvia came back to join us.
posted evening of Sunday, September 7th, 2003 ➳ More posts about Sylvia ➳ More posts about Window seat ➳ More posts about Home improvement ➳ More posts about Projects
|